Ubiquiti Wave Pro Wave-Pro

The Ubiquiti Wave Pro (Wave-Pro) is an outdoor, high-capacity 60 GHz fixed wireless radio for long-distance point-to-point bridges and compatible Wave point-to-multipoint station connections. Ubiquiti specifies up to 5.4 Gbps total throughput, a 46 dBi high-gain directional antenna, and a 5 GHz Wi-Fi 6 backup radio for resilience when primary-band conditions deteriorate. The radio includes two 2.5 GbE RJ45 interfaces, one 10G SFP+ interface, and an included 48 V passive-PoE adapter. Published maximum link distances are up to 15 km for point-to-point operation, up to 8 km when used as a station with Wave AP, and up to 6 km with Wave AP Micro or Wave AP Gen2. Actual performance depends on alignment, clearance, weather, network design, compatible peer equipment and applicable frequency rules. The IPX6-rated enclosure suits planned outdoor installations with proper mounting and cable protection. For ISP backhaul or building-to-building projects in Tanzania, request a site survey and itemised quotation covering the full link, including hardware compatibility, power, mounting, interfaces, configuration and commissioning. Local stock, delivery, warranty conditions and pricing require direct confirmation from the seller.

Category:

UBIQUITI UISP • OUTDOOR WIRELESS BACKHAUL

Ubiquiti Wave Pro (Wave-Pro) — 60 GHz PtP & PtMP Station

Connect buildings or build compatible Wave infrastructure with a high-capacity directional outdoor radio. Designed for 60 GHz fixed wireless links, with a separate 5 GHz backup radio and multi-gigabit wired connectivity. For a Tanzania deployment, request an assessment of the complete link rather than relying on a datasheet range alone.

Request a site-based suitability review and itemised quotation.

Key specifications at a glance

Primary radio 60 GHz; worldwide listed 57–71 GHz (subject to local rules)
Total rated throughput Up to 5.4 Gbps
Point-to-point range Up to 15 km
PtMP station range Up to 8 km to Wave AP; 6 km to Wave AP Micro or Wave AP Gen2
Backup radio 5 GHz, 802.11ax (Wi-Fi 6)
Primary antenna gain 46 dBi
Primary beamwidth 1.3° × 1.3°
Network ports 2 × 2.5 GbE RJ45; 1 × 10G SFP+
Power consumption 26 W maximum
Power supply 48 V DC, 0.65 A 2.5 GbE PoE adapter included
Weatherproofing IPX6
Dimensions Ø 424.4 × 166.2 mm
Weight 2.8 kg without mount; 4 kg with mount
Pole diameter 25–76.2 mm
Operating temperature −40 to 60°C
Management UISP 2.3.0 or later listed

Published manufacturer maxima are not guaranteed field performance; verify local frequency rules and site design.

Overview: what Wave Pro is built to solve

The Ubiquiti Wave Pro (Wave-Pro) is a high-capacity outdoor radio for organisations that need to connect locations without installing a continuous cable run between them. It is designed for long-distance point-to-point bridging and for use as a station in compatible Wave point-to-multipoint networks. Rather than thinking of this device as a conventional indoor Wi-Fi access point, consider it a specialised part of a fixed wireless infrastructure project. A pair of suitable radios, correct configuration, a clear path, appropriate mounts and correctly planned power and network connections are required for a complete installation. Wave Pro uses a directional 60 GHz link for high throughput, alongside a 5 GHz backup radio to support resilience when 60 GHz conditions deteriorate. The manufacturer specifies a maximum combined throughput of 5.4 Gbps, but that figure should not be confused with an unconditional delivered internet speed, guaranteed single-direction rate or service-level commitment. Real performance depends on the distance, alignment, channel conditions, environmental conditions and capabilities of the rest of the network. Before ordering for a Tanzania deployment, share the intended endpoints, distance and connectivity objectives so the complete design—not just the radio model—can be reviewed.

Who should consider this radio

Wave Pro is relevant to wireless internet service providers building high-capacity distribution links, network integrators connecting separated premises, and organisations that operate two or more buildings with an established line of sight. A business may want to connect an office and a remote operations building. An operator may need to extend connectivity to a distribution site where trenching fibre is impractical. A campus might require a dedicated bridge between network cabinets located on different structures. In each case, the purchasing question should be whether a planned link can sustain the required applications, not merely whether the datasheet maximum range looks long enough. A strong candidate site normally offers accessible installation points, safe mounting positions, a stable power feed, well-defined network handoff, and the ability to assess obstacles and changing weather. Wave Pro is not the right answer for providing ordinary Wi-Fi coverage to laptops and phones, nor is it an automatic replacement for every microwave, fibre or leased-line connection. The choice should follow a site survey, throughput requirement, resilience target and comparison with alternative architectures. Its role is particularly attractive where fast fixed wireless capacity and high directional gain are primary considerations.

Point-to-point and point-to-multipoint roles

In point-to-point mode, the aim is a dedicated bridge joining two endpoints across an outdoor path. Both ends must be designed as a compatible link, with suitable antennas and network interfaces and a configuration appropriate to the desired traffic. In point-to-multipoint deployments, the Wave Pro serves as a station associating with compatible Wave access-point infrastructure; it is not itself a sector access point for distributing service to many subscriber stations. That distinction matters when preparing a bill of materials. Manufacturer specifications list point-to-point operation and point-to-multipoint station operation as supported modes. A purchaser should therefore identify whether the intended deployment is a paired building bridge or a station within a larger access network, then verify the particular peer device, firmware, capacity sharing and operating configuration. A multiple-subscriber design must also account for aggregate traffic, scheduling, oversubscription, coverage angles and customer installation practices. Buying a high-specification station does not automatically raise the capacity of an upstream access point or eliminate congestion elsewhere in the network. A properly documented topology and compatible equipment selection should precede ordering.

Understanding the headline throughput

Ubiquiti lists 5.4 Gbps as the Wave Pro total throughput specification. It is best treated as an upper-limit product capability used for comparative planning rather than as a promise that every application will receive the same figure. In network design, total duplex or aggregate capacity differs from one-way application throughput, and protocol overhead, radio link quality, Ethernet configuration, traffic type and switching or routing resources affect what users experience. A customer evaluating a multi-gigabit connection should calculate peak and sustained demand separately. Consider how many users share the link, whether flows are mostly downstream or symmetrical, and how much spare capacity is required for growth. Tests should measure real network traffic under representative conditions after installation. The two 2.5 GbE copper ports and 10G SFP+ connection provide useful interface options, but one 2.5 GbE handoff cannot by itself convey a single flow exceeding that interface’s physical line rate. The complete data path—from radio to upstream equipment—must be sized appropriately. If traffic depends on an upstream broadband service, the radio cannot make that service faster than its contracted or delivered capacity.

Distance planning and realistic expectations

The manufacturer states up to 15 km for point-to-point links and up to 8 km to a Wave AP in point-to-multipoint mode. For a Wave AP Micro or Wave AP Gen2, the stated point-to-multipoint figure is up to 6 km. These are different topology-specific reference limits and should not be combined into one universal distance claim. Range is not just a map measurement. A feasibility assessment should consider the height of both installation locations, line-of-sight clearance, seasonal obstructions, building movement, antenna alignment, local interference and rain conditions along the link. At millimetre-wave frequencies, the path budget and availability target become especially important. A link that connects in fair weather might not deliver the same capacity during difficult conditions. Distance and achievable performance must therefore be validated with appropriate planning tools and on-site tests rather than inferred from catalogue figures. If the endpoints are far apart, share coordinates or a carefully described route with the installer rather than assuming that any two rooftops within the advertised kilometre limit can be linked. For important service, specify availability targets and the fallback behaviour before accepting a design.

60 GHz primary link: strengths and trade-offs

The primary radio operates in Ubiquiti’s stated worldwide 57–71 GHz range, subject to applicable local rules and permitted equipment configuration. This spectrum enables substantial channel bandwidth, while the highly directional antenna helps concentrate energy toward the other end of the link. That directional behaviour is valuable for carefully engineered fixed connections, especially where the goal is high capacity between known positions rather than broad-area coverage. The trade-off is that high-frequency paths demand meticulous alignment and are sensitive to obstructions and precipitation effects. Trees, new structures and poorly placed poles can introduce serious reliability concerns. Even a small mechanical shift may matter when the antenna beam is narrow. An installer should establish accurate aiming, keep the full path suitably clear and use mounting hardware capable of remaining stable under expected wind. The applicable radio frequency authorisations and channel settings must be checked for the exact Tanzanian installation; an international frequency range or foreign certification is not evidence of local approval. Customers should plan with the selected equipment’s regulatory settings and obtain appropriate professional guidance where required.

5 GHz backup radio: practical resilience

Wave Pro integrates a 5 GHz backup radio based on Wi-Fi 6 technology. This radio is designed to maintain a usable link path when conditions prevent optimal operation of the primary 60 GHz connection. The backup does not mean both bands provide identical throughput, nor does it guarantee uninterrupted delivery under every weather event or obstruction scenario. The design must account for lower backup capacity, channel availability, interference and the behaviour of the connected peer equipment. In particular, a capacity-sensitive application may need quality-of-service rules so that essential traffic is prioritised when the connection runs in a reduced-performance state. Review what level of degraded service is acceptable: email and transactional systems may remain usable when large synchronisation jobs or high-resolution video transfers must slow down. During commissioning, test the network’s failover and recovery behaviour where supported, document expected alarms and confirm that monitoring distinguishes 60 GHz operation from fallback operation. For Tanzania projects, do not assume specific 5 GHz channels are permitted merely because the radio supports them in another territory. Local regulatory requirements, site noise and equipment configuration all deserve verification.

Precision antenna alignment

The Wave Pro primary antenna has a manufacturer-listed gain of 46 dBi and a narrow 1.3-degree azimuth and elevation beamwidth. These figures help explain why careful mechanical pointing is so important. A narrow beam can support a focused high-capacity link, but it also makes careless rooftop alignment a costly mistake. Installers should choose a strong mounting structure and use a deliberate alignment method rather than relying on visual aiming alone. The unit includes antenna-alignment utilities, and the equipment’s physical mount is designed for accurate positioning. Work should account for mast movement, fastener security, wind loading and the accessibility of the final adjustment position. After initial aiming, validate received link quality and end-to-end throughput, then repeat key checks after hardware is fully tightened. The alignment process should be documented so that future technicians know the intended bearing and normal performance range. If a rooftop is shared with other equipment, allow space for safe access and cable service loops without creating obstacles in the radio path. An expensive radio poorly mounted can deliver less value than a correctly designed lower-capacity link.

Ethernet and fibre handoff choices

The manufacturer specifies two 2.5 GbE RJ45 interfaces and one 10G SFP+ interface. These interfaces give planners options for connecting the outdoor radio into the wider network, but a port list alone does not describe a complete network design. Determine where the upstream switch or router will sit, the required cable type, allowable cable run, lightning and grounding strategy, and whether an appropriate SFP+ module or fibre connection is needed. Confirm the transceiver and peer equipment against applicable compatibility guidance rather than assuming every optic works in every setting. When 2.5 GbE copper is used, verify that intermediate switches and negotiation settings support the selected speed; otherwise an unnoticed 1 GbE bottleneck can constrain results. Where fibre is desirable to separate building electrical environments or deliver a faster network handoff, plan the full optical path, media, patching and mechanical protection. The SFP+ presence should not be interpreted as proof that every optical module, topology or operating mode is supported. Keep the cable and port plan simple enough to troubleshoot and document the final addressing, VLANs, traffic policies and link monitoring arrangement.

Power and passive PoE considerations

The Wave Pro’s maximum power consumption is specified at 26 W, and Ubiquiti lists an included 48 V DC, 0.65 A, 2.5 GbE PoE adapter. It supports particular passive-PoE arrangements, including different voltage provisions depending on the wiring mode. This is a technical point that deserves explicit verification before installation. Passive PoE is not interchangeable with every generic active PoE port, and incorrect voltage, pinout or injector choice may damage equipment. The integrator should follow the manufacturer’s connection guidance and use an approved compatible power arrangement. Consider mains quality, UPS capacity, surge exposure, cable shielding and equipment earthing as part of the project design. In locations where power interruptions are common or the radio carries critical services, a power-backup plan is as important as the radio’s advertised performance. Outdoor cable runs should be routed to resist water ingress and mechanical strain. Record where the injector is installed and which port feeds power so replacement technicians do not have to guess. Never assume the presence of an Ethernet connection means the radio can be powered by an arbitrary PoE-enabled switch.

Outdoor construction and site durability

Wave Pro is housed in an aluminium-alloy and UV-stabilised polycarbonate enclosure, with a stainless-steel mount. Ubiquiti specifies IPX6 weatherproofing and an operating temperature range of minus 40 to 60 degrees Celsius. These are product specifications, not a substitute for a proper outdoor installation. An IPX6 rating concerns water exposure under specified test conditions and should not be represented as a dust-ingress rating or a promise that poor cable termination can never admit moisture. Outdoor service life also depends on cable selection, connector protection, drainage, corrosion conditions, physical security and mounting workmanship. The manufacturer lists a pole-mount diameter range of 25 to 76.2 mm, making the structure choice an explicit part of planning. Inspect the actual pole dimensions and ensure the structure is capable of handling the radio and foreseeable wind forces. The published wind-loading reference is 369 N at 200 km/h; it should inform engineering review, not replace one. Coastal or highly exposed installations may require additional thought about material compatibility, maintenance access and local site conditions.

Network administration with UISP

Wave Pro belongs to Ubiquiti’s UISP ecosystem, and the manufacturer’s technical specification lists UISP version 2.3.0 or later as the application requirement. Administrators should check their deployment software version, supported device firmware and intended provisioning workflow before adding radios to a production network. UISP can help organise supported infrastructure, but a management platform is useful only when equipment is labelled clearly and operational processes are defined. Establish a naming scheme that identifies endpoints and responsible locations without exposing sensitive customer data. Record management IP addresses, installation dates, expected radio mode, normal link quality and maintenance ownership in a secure network inventory. The device lists utilities and services including antenna alignment, site survey, speed test, ping, traceroute, discovery, SNMP and a ping watchdog. Use these tools to create a baseline that technicians can compare with later. Verify credentials, software update practices and access control during commissioning. Where a link supports vital business traffic, determine how link degradation will be detected and escalated, and whether 5 GHz backup operation needs a specific alert.

Choosing bridge mode or router mode

The published network features include bridge/router mode. That choice should follow the intended network architecture and operational boundary. A transparent bridge is attractive when two physical locations must share a planned Layer 2 design, but extending broadcast domains across sites can introduce unwanted complexity if VLANs, spanning tree and failure conditions are not understood. Routed designs can provide clearer segmentation and fault domains, but they require an IP addressing and routing plan. Neither approach is automatically superior for every site. A network architect should determine whether the link connects switch fabrics, transports tagged traffic, links separate routed networks or supports a managed subscriber service. Document expected MTU behaviour, addressing, DHCP placement and the responsibilities of upstream security equipment. Radio encryption does not replace a complete security architecture or eliminate the need to manage customer traffic safely. For a multi-tenant or ISP environment, special attention belongs on customer isolation, management access and congestion control. Plan these decisions before the installation team reaches the roof; they can be difficult to reverse during a live cutover.

ISP backhaul and distribution design

For internet service providers, high-capacity fixed wireless equipment can be part of the path between a core location, a distribution point and a customer access network. Wave Pro may suit a planned high-throughput segment or a compatible Wave station location, but the capacity of one radio does not define the capacity of the entire service chain. Model concurrent subscribers, contention, upstream bandwidth, peak usage windows and any traffic shaping policy before specifying equipment. In point-to-multipoint scenarios, the access point’s sector capacity, coverage and supported station distance also matter. A station must be compatible with the selected Wave access point and its network configuration. Align the planning model with realistic local application demand, including video meetings, cloud software, software updates and backup traffic, rather than using a single impressive throughput number. Decide whether the link is a primary path, a backup path or an intermediate hop, and document the effect of a failure. A good ISP design also gives technicians safe access, unambiguous labels and a way to distinguish radio-layer faults from upstream congestion or customer-premises problems.

Building-to-building connectivity

A building-to-building project often begins when an organisation needs network access in an adjacent office, warehouse, industrial unit, training facility or operations building. Wave Pro can provide a fixed radio path where a suitable line of sight and compatible counterpart are available. The installation must still be planned as a complete bridge rather than an accessory attached to an existing Wi-Fi router. Identify the required business applications, expected users and security boundaries. Determine whether the remote building needs its own access switches, wireless access points, UPS, firewall policies and cable containment. If the connection crosses a public area or an occupied site, consider safe access for installers and any permits or property agreements. A successful bridge must be both fast and manageable: after deployment, staff should be able to diagnose whether a complaint relates to the radio, the destination switch, local Wi-Fi coverage or the internet service itself. Establish a throughput acceptance test and maintenance responsibilities with the installer. Do not specify the link solely from the straight-line distance between buildings; obstruction clearance and mounting access remain decisive.

Enterprise resilience and critical applications

Organisations that carry point-of-sale data, video surveillance backhaul, operational systems or voice services across a wireless link need to define what happens when performance falls. Although Wave Pro incorporates a backup radio, it is not an automatic business continuity plan. The rest of the network may need redundant power, alternate routing, application prioritisation, monitoring and a separate upstream circuit. Start with a service-impact assessment: what stops working during a complete link outage, and what can tolerate a slower path? For video workloads, consider average and peak bitrate, recording patterns and latency expectations. For voice and interactive services, review jitter, packet loss and contention under normal and fallback conditions. For cloud-dependent operations, evaluate the internet connection at both ends as well as the radio bridge. A realistic acceptance plan includes a normal-load test, a heavier-load test, alarms and an agreed recovery process. Where the service is essential, professional design review is justified because the costs of prolonged downtime may exceed the equipment purchase price. No single radio specification can guarantee an availability target without site-specific engineering.

Rain, obstructions and seasonal planning

Weather and environmental planning matter for fixed outdoor microwave links, particularly a 60 GHz path. Heavy rainfall can attenuate the primary signal, while moving vegetation, temporary construction and changes in rooftop equipment can affect line-of-sight clearance. The 5 GHz backup is valuable, but its own performance also depends on path conditions and the radio environment. A survey should account for likely seasonal changes and the full intended service period, not only the view on the day of installation. Observe the link path from both ends wherever practical. Consider whether trees may grow into the clearance area, whether adjacent buildings could add structures, and whether vibration or wind can change antenna pointing. If the location is vulnerable to lightning or unstable power, include protective and continuity measures in the system design. Tanzania has varied local environments, and the appropriate engineering approach depends on the actual location rather than a generic national assumption. Customers should provide photographs, approximate elevations and any known obstructions to help the integrator decide whether further field measurements are needed.

Pre-purchase compatibility checks

Before purchasing Wave Pro, confirm the exact peer product and operating topology. A point-to-point project is not the same as adding a station to a Wave access point, and the manufacturer’s stated ranges differ by compatible access-point model. Verify the equipment firmware and software versions required for the chosen design, the available interfaces on both ends and the intended management platform. Ask whether the existing switch supports 2.5 GbE or 10G SFP+ as planned, and whether the selected optics or cabling have been confirmed compatible. Check power requirements carefully: passive PoE details matter and should not be treated as a generic PoE accessory specification. Verify antenna mounting options, pole dimensions, safe rooftop access and the amount of cable needed. If high service availability is required, the quote should also define backup strategies, monitoring and power continuity. For commercial procurement, request clear confirmation of what accessories, installation labour and commissioning services are included in the offer. A carefully assembled bill of materials avoids discovering after delivery that an essential mounting, connection or network component is missing.

Site survey checklist

A useful survey begins with a description of both endpoints and a map of how data will move between them. Record building or tower heights, coordinates where available, mounting options, power sources, access restrictions and the desired bandwidth. Inspect potential obstructions and assess whether structural movement could affect the narrow antenna alignment. Capture photographs of the intended mounting positions and cable routes. Confirm where Ethernet or fibre handoff will terminate indoors and whether a cabinet has space for the necessary power components and monitoring equipment. Identify whether the path serves a single dedicated peer or a point-to-multipoint access-point system. For a point-to-multipoint design, identify the access-point model and expected station count. Evaluate expected peak traffic, backup capacity requirements, regulatory configuration, local radio conditions and the consequences of a service interruption. Document assumptions that cannot be verified before fieldwork; they should become explicit survey questions rather than hidden claims in the quotation. Survey results should drive the recommended equipment, mounting arrangement, acceptance criteria and costed implementation scope.

Installation sequence and commissioning

A sensible deployment starts with a confirmed design, a suitable location and a complete bill of materials. Inspect the radio and accessories before climbing to the installation point. Prepare safe access and appropriate fall-protection practices for qualified personnel. Mount the radio on a compatible, stable structure, route outdoor-rated cabling and follow the manufacturer’s guidance for power and grounding. Ensure connectors and cable entries are protected from the site environment. Align the unit using the relevant management and alignment tools, then check that it is connected to the intended peer and operating in the desired mode. Validate the primary 60 GHz connection and review the state of the 5 GHz backup. Test real network throughput over the intended interfaces and confirm that the remote site can reach only the networks it is supposed to access. Record the equipment configuration, firmware version, baseline signal measurements and any service thresholds used for monitoring. Finish with a documented handover: endpoint details, topology diagram, inventory, maintenance contacts and practical fault-isolation instructions. Installation should not be considered complete just because a link status indicator turns on.

Troubleshooting an underperforming link

When a Wave Pro connection performs below expectations, start with evidence rather than immediately changing radio settings. Compare current performance against the commissioning baseline and inspect whether the radio is using the 60 GHz primary path or the backup path. Look at link quality, device status, error indications, power stability and connected-port negotiation. A switch port that has negotiated at a lower speed can produce a bottleneck even if the radio path is healthy. Check whether the upstream network, internet circuit or application server is limiting traffic. If radio performance has changed after weather, building work or high winds, reassess antenna pointing and physical clearance. Review recent configuration changes and software updates, then use supported diagnostics such as ping, traceroute or speed tests to narrow the fault. Avoid making multiple uncontrolled changes simultaneously; change records simplify recovery. If the site supports customers or critical business functions, establish a maintenance window and rollback plan. Persistent issues may require a professional link-budget and site assessment rather than repeated trial-and-error adjustments.

Security and maintenance planning

The manufacturer lists WPA2-PSK (AES) encryption and management features, but secure operations require more than enabling a radio password. Treat management interfaces as controlled infrastructure. Use a documented credential process, limit administrative access, apply relevant firmware security updates after appropriate testing and keep an inventory of the deployed devices. Separate management traffic from customer or application traffic where the network architecture requires it. Check upstream firewall rules and segmentation, especially when the radio joins two organisations, properties or business units. Monitoring should detect loss of connectivity, unusually low throughput and persistent fallback operation. Periodic maintenance can include physical inspection of mounts, cables, connectors and grounding, as well as checks of recorded baseline link quality. The service owner should know who is authorised to make changes and where configuration backups are stored. On a busy ISP network, plan updates so that subscribers are informed of potential interruptions. Good security and maintenance discipline protects the value of the equipment after the initial installation and helps the network remain supportable as personnel and locations change.

Alternative connections and design trade-offs

Wave Pro is one option among several ways to connect sites. Fibre may deliver an excellent long-term path where civil works, rights of way and installation costs are acceptable. Lower-frequency wireless systems may offer different propagation and capacity characteristics, while managed leased circuits reduce the amount of radio infrastructure a customer operates directly. A 60 GHz system may be appealing where a high-capacity link can be engineered quickly across a clear path, but site geometry and weather resilience should drive selection. Compare total project cost, not only radio price: mounts, poles, surge protection, power systems, optics, civil work, surveying, safe installation, monitoring and support all contribute. Also compare failure impact and restoration options. A lower-cost link with no feasible repair access may be a poor choice for critical production traffic. The most useful procurement conversation begins with required capacity, distance, uptime, growth, service ownership and budget. An integrator can then consider Wave Pro alongside alternatives rather than assuming one device meets all possible scenarios. Performance promises should follow a site-specific design and agreed testing method.

How to request a meaningful quotation in Tanzania

To evaluate Ubiquiti Wave Pro in Tanzania, provide the link purpose, the number of endpoints, approximate distance, site type and expected traffic. State whether the requirement is a point-to-point bridge or a station in an existing Wave point-to-multipoint network. Include the model of any existing access point, router or switch that the radio must connect to. If available, add site photographs, mounting heights, known obstructions and cabling requirements. Explain whether the service is business-critical, whether a fallback speed is acceptable and which party will install and maintain the system. Ask for a quote that clearly distinguishes the radio unit from any additional peer radio, mounts, power accessories, optics, infrastructure work and commissioning. Confirm the exact local selling price, applicable tax treatment, stock status, lead time and warranty terms directly in the formal offer; these have not been verified for this listing and should not be guessed. The result should be a proposal tied to the actual deployment rather than a generic price for a single device that may not complete the network.

Frequently asked questions: product role and range

Is Wave Pro an ordinary Wi-Fi access point? No. It is a specialised outdoor fixed-wireless radio for supported bridge and station roles, not a general indoor Wi-Fi coverage device. Can a single unit connect two buildings by itself? A working link requires compatible equipment at the other end and a complete network and installation design. What is the maximum quoted point-to-point distance? Ubiquiti lists up to 15 km, subject to link conditions and design. What about point-to-multipoint range? The manufacturer lists up to 8 km with Wave AP and up to 6 km with Wave AP Micro or Wave AP Gen2. Does every 15 km link deliver the full throughput figure? No; range and throughput specifications should not be interpreted as a universal guaranteed combination. Why is line of sight important? The narrow directional 60 GHz path needs suitable clearance and precise alignment to perform as intended. Is it appropriate for a small office? It may be appropriate for an inter-building connection, but it is unnecessary for normal Wi-Fi access within one office.

Frequently asked questions: capacity, backup and connectivity

What does 5.4 Gbps mean? It is Ubiquiti’s stated total throughput specification, not a guaranteed end-user download speed. Does the 5 GHz backup always match primary capacity? No; fallback should be planned as a potentially reduced-capacity operating state. Does the radio provide 10G connectivity? The hardware includes a 10G SFP+ interface, but the achievable traffic path depends on other interfaces, configuration and the network design. How many copper ports are included? The technical sheet lists two 2.5 GbE RJ45 ports. Can any PoE switch power it? No; power compatibility depends on the supported passive-PoE arrangements and must be checked against the installation guide. Is an injector included? The manufacturer specifies an included 48 V DC, 0.65 A, 2.5 GbE PoE adapter. Does it support UISP? Yes, with the published application requirement of UISP version 2.3.0 or later. Is the radio a router? It lists bridge/router modes, but the intended network architecture must determine how that feature should be used.

Frequently asked questions: environment, procurement and deployment

Is Wave Pro weatherproof? Ubiquiti specifies IPX6 weatherproofing; correct mounting and cable protection are still essential. Can it be installed anywhere in Tanzania? Suitability depends on the exact site, compatible peer equipment, local regulatory requirements and installation design. Are its foreign certification listings proof of Tanzanian type approval? No; local approval or regulatory status must be checked separately and should not be assumed. Is the model suitable for a windy rooftop? The manufacturer publishes a wind-loading specification, but the supporting structure and fixings still require appropriate engineering assessment. Is local stock confirmed? No stock status has been verified for this listing. What is its price in Tanzanian shillings? A verified Tanzania listing price is not currently available for this content, so a current quotation is required. Will a unit automatically improve internet service speed? No. Speed is limited by the end-to-end system, including the subscribed upstream service. What should a buyer send with a quote request? Share the topology, link distance, endpoint information, target capacity and deployment environment.

Final buyer checklist and next step

Before approving a Wave Pro purchase, confirm that the model is the right device for the planned point-to-point or compatible point-to-multipoint station role. Check that the path is feasible for a narrow-beam 60 GHz connection and that the desired capacity and backup performance have been assessed. Verify the chosen peer device, UISP environment, switch interfaces, power method, mounting structure, grounding and cable route. Separate radio specifications from system-level promises: peak throughput, maximum stated range and weatherproofing do not eliminate the need for a survey and acceptance test. For a critical link, document service priorities, alerting, site access and recovery arrangements before installation. Request confirmation of the precise supplied accessories and any required additional hardware, including a compatible counterpart where necessary. Buyers in Tanzania should also verify the applicable radio regulations and obtain the commercial offer in the appropriate local terms rather than relying on assumptions about price or delivery. To proceed, request a Wave Pro suitability review and itemised quotation based on your endpoints, distance, use case and network interfaces. The aim is to procure a complete, supportable connection—not simply a high-performance radio in isolation.

Capacity worksheet for project owners

A basic capacity worksheet can prevent overbuying or underbuying. List the applications that must cross the radio path, estimate their normal and busy-hour requirements, and distinguish essential services from optional transfers. Include anticipated user growth, simultaneous video traffic, backups, file synchronisation and any operational systems with fixed performance expectations. Compare the resulting demand with the entire topology, including wired interfaces and the upstream connection. In a shared service, account for contention rather than simply summing advertised user access speeds. Decide how much reduced throughput is acceptable if the 5 GHz backup path is active. Make test conditions explicit so commissioning results can be interpreted fairly. For example, an internet download test may measure the upstream provider rather than the radio’s maximum capability, while a local end-to-end test can better isolate the link. Document where test devices connect, whether switching and routing are involved, and what background traffic is present. Use those records to make a clear, defensible acceptance decision.

Mechanical and electrical handover

The installation handover should include more than a photograph of an operating radio. Record the exact mounting point, structure dimensions, cable route, power source and the location of each relevant protection or termination component. Include the peer device and port map. Confirm that suitable weather protection is in place around external connectors and that the installation does not create dangerous water paths into indoor equipment. List the installer and the party authorised to access the rooftop or mast. For ongoing maintenance, the team should have a safe method for reaching the installation without disturbing the alignment. Power information should identify the correct injector or compatible source and discourage substitution with unidentified PoE equipment. When using fibre, document the module and fibre type; with copper, document the actual negotiated link speed. The handover also needs a diagram and baseline radio measurements. This practical record is valuable during staff changes, future building work and troubleshooting after storms or power incidents.

Monitoring and operational thresholds

Operators should define what a healthy Wave Pro link looks like before it becomes business-critical. Monitor whether the radio is reachable, which band is currently carrying traffic, and whether performance deviates from the installation baseline. Track interface speed and errors where available, as these may reveal a wired bottleneck even when the wireless link looks healthy. Decide how quickly a prolonged fallback event should trigger investigation, and set alerts so that minor transient changes do not overwhelm the support team. A throughput alarm should be interpreted alongside actual traffic demand; low utilisation alone is not a fault. Establish maintenance ownership and a process for recording firmware upgrades, antenna adjustments and network changes. In a subscriber network, correlate radio events with customer-impact reports and upstream equipment logs. In an enterprise network, include the radio path in business continuity testing and change-management plans. Monitoring is most useful when alerts lead to specific diagnostic steps and the team knows who can respond.

Commercial scope of supply

An itemised quotation is easier to evaluate than a single unexplained price. Ask the supplier to identify the exact model Wave-Pro, unit quantity, peer equipment if needed, mounting items, power arrangement, optical modules where applicable, cables, protection hardware and installation services. Confirm which accessories are included by the manufacturer and which must be purchased separately for the actual site. A remote station may need additional upstream infrastructure, and a building bridge normally needs compatible radio equipment at both ends. Request a written statement of what configuration, testing, training and handover work is included. Clarify who takes responsibility for survey assumptions, frequency configuration, mounting strength and ongoing support. If delivery or installation is included, the formal offer should state its actual scope and commercial conditions. Avoid treating an advertised device price as the complete project cost. Without verified local listing data, do not infer Tanzanian shilling prices, warranty terms, lead times or stock position from the manufacturer’s overseas store.

Scale and future expansion

Designing for future growth can reduce expensive changes later. Consider whether the planned radio is a single temporary connection or the first element of a larger distribution topology. If demand is expected to grow, review the upstream network interfaces, switch capacity and access-point compatibility along with the air link. Future station additions to a point-to-multipoint system may affect shared capacity, and those changes should be incorporated into the network model. A point-to-point link that serves one building today may later transport traffic for additional users, cameras or services. Reserve sensible capacity while avoiding claims that current equipment can support unknown future applications without re-evaluation. Document available mounting space, power budget and network handoff options. Where a different topology may ultimately be required, it can be better to plan the transition now than to rely on an ad hoc expansion. Seek a design review whenever the link is being asked to carry materially greater loads or serve more critical functions.

What the product is not

Understanding exclusions is a useful part of making the right purchase. Wave Pro is not a complete internet service, an all-purpose indoor Wi-Fi access point, a substitute for a proper rooftop survey or a guarantee of a particular link uptime. A 10G SFP+ physical interface does not imply that every application achieves 10 Gbps, just as a maximum range claim does not mean full-speed operation is feasible at that distance. Its 5 GHz backup should not be confused with a separate independent carrier circuit. Outdoor resistance does not excuse poor terminations or unsafe installation. It is also not appropriate to assume that a unit manufactured for multiple markets automatically satisfies the radio approval requirements of every country. These distinctions help purchasing teams avoid specification misunderstandings. If your requirement is general office Wi-Fi, a different product family may be suitable; if your requirement is high-capacity outdoor fixed wireless backhaul, this model deserves consideration within a complete engineered design.

Evaluating an upgrade from an older bridge

An upgrade project should begin by measuring the existing link rather than automatically choosing the highest-capacity replacement. Record current throughput, latency patterns, downtime incidents, radio frequency conditions, network interfaces, mounting limitations and application demand. Identify the specific problem to solve: insufficient capacity, poor resilience, ageing equipment, lack of management integration or a wider network bottleneck. Then assess whether Wave Pro, a compatible peer and any required network changes address that problem. Existing poles and cabling may not suit the new antenna dimensions, passive-PoE requirements or multi-gigabit handoff. A phased cutover may be needed to minimise service interruption, especially where the old bridge serves paying customers or critical operations. Prepare a rollback plan and ensure technicians can access both endpoints during commissioning. After cutover, compare measured performance with the original baseline and project criteria. The upgrade is successful when it solves the documented service requirement, not merely when a higher headline product specification appears on the equipment list.

Decision guide for technical purchasers

A technical purchasing decision should answer five connected questions. First, what traffic and availability must the link support today and in the near future? Second, is there a clear and stable path suitable for the 60 GHz radio and the antenna’s narrow alignment requirements? Third, is the proposed point-to-point or point-to-multipoint topology compatible with Wave Pro and the selected peer? Fourth, can the site provide the correct power, mounting, management and wired network handoff? Fifth, does the commercial offer cover all of the equipment and engineering tasks required for a working service? If any of these answers is unknown, request a design clarification before ordering. The best quote will distinguish verified device capabilities from deployment-specific assumptions, and will say how acceptance tests will be carried out. This decision process supports informed procurement whether the project belongs to an ISP, integrator, campus or private enterprise network. It also gives operations teams the documentation they need after commissioning.

Request a Wave Pro quotation

Tell FourTeck Tanzania about the proposed endpoints, estimated distance, required capacity and existing network equipment. Request confirmation of model suitability, compatible peer hardware, installation accessories, local commercial terms and any applicable regulatory requirements before ordering.

Ask for a complete link design and itemised offer.