Ubiquiti airFiber 5 AF-5

The Ubiquiti airFiber 5 AF-5 is a dedicated mid-band point-to-point wireless bridge intended for engineered network backhaul between two fixed sites. Ubiquiti rates the platform for maximum throughput of 1.2+ Gbps and maximum range above 100 km, subject to regulatory region and actual deployment conditions. The integrated directional antenna, GPS radio-frame synchronization and gigabit data interface suit high-capacity link planning for service providers, campus networks and enterprise facilities. The radio uses a specified 50 V passive PoE power supply and also provides a separate management Ethernet interface. A complete link requires suitable equipment at both ends, secure mounting, correct cabling, surge protection, careful alignment and a compliant channel plan. In Tanzania, the intended operating frequency, transmission power and any applicable spectrum authorization must be checked before installation. The quoted maximum speed and range are not guaranteed for a particular route. Request a current quotation covering the exact AF-5 model, endpoint hardware, accessories and any survey or installation services needed. Share your proposed endpoints and capacity target to support an accurate technical assessment.

Category:
Wireless backhaul · Tanzania

Ubiquiti airFiber 5 AF-5 Mid-Band Point-to-Point Bridge

Connect two fixed network sites with a high-capacity directional wireless backhaul. The Ubiquiti airFiber 5 AF-5 is designed for engineered point-to-point deployments, with manufacturer-rated maximum throughput of 1.2+ Gbps. For Tanzania installations, verify the path, radio-frequency permissions and complete bill of materials before ordering.

At a glance

AF-5 mid-band1.2+ Gbps rated maximumPoint-to-pointGPS synchronization

Technical specifications

Product Ubiquiti airFiber 5 Mid-Band
Model / MPN AF-5
Purpose Fixed point-to-point wireless backhaul
Manufacturer rated throughput 1.2+ Gbps maximum
Manufacturer rated range 100+ km maximum, region and path dependent
RF channel widths 10 / 20 / 30 / 40 / 50 MHz
Integrated antenna 23 dBi, directional
Network ports 1 × GbE data; 1 × 10/100 MbE management
Security 128-bit AES
Synchronization GPS radio-frame synchronization
Power 50 V 1.2 A passive PoE adapter; up to 40 W
Dimensions 938.4 × 468.4 × 281.4 mm
Weight with mounting 16 kg
Ambient operating temperature −40 to 55°C

Specifications are manufacturer-published capabilities; actual operating conditions, legal channels and usable capacity require deployment-specific verification.

What the AF-5 is designed to solve

The Ubiquiti airFiber 5 AF-5 is a dedicated point-to-point wireless bridge for connecting two fixed network sites. It is intended for organizations that need to move substantial traffic between buildings, towers or network aggregation points without laying a new fibre route. A point-to-point bridge is different from an ordinary Wi-Fi access point: the radio forms a focused backhaul connection to another appropriately configured radio, rather than providing general wireless access to phones and laptops. For an ISP, the connection may carry aggregated subscriber traffic between a distribution location and an upstream site. For an enterprise, it may extend a wired LAN between facilities separated by roads, land or other obstacles. Evaluate the product as part of an engineered link, not as an automatic solution for any distance. Check site access, a clear path, capacity targets and permitted spectrum before choosing hardware. Request a project-specific quotation for AF-5 equipment and the other materials needed at both endpoints.

Understand the mid-band model

The AF-5 model is the airFiber 5 Mid-Band bridge. It must not be confused with the AF-5U High-Band variant, the airFiber 5XHD or a standard airMAX device. Similar naming does not mean identical allowed frequencies, accessories, radio behaviour or interchangeability. Ubiquiti’s installation documentation lists different operating-frequency ranges for AF-5 and AF-5U. For the AF-5, the guide lists 5470–5600 MHz and 5650–5850 MHz for specified FCC/IC settings, 5470–5875 MHz under listed ETSI settings, and 5470–5950 MHz for other regions. Those figures describe device capability and documentation categories; they are not an authorization to operate across every listed channel in Tanzania. The equipment configuration and channel plan must obey local requirements. When requesting a quote or planning a replacement, state the exact AF-5 model and the existing link’s regulatory region, channels, mounted hardware and remote-end equipment. Confirm the exact unit variant and proposed channel before purchasing.

Meaning of the 1.2+ Gbps rating

Ubiquiti specifies maximum throughput of 1.2+ Gbps for the AF-5 platform. This is a maximum product capability, not a guaranteed Internet speed, committed service rate or assurance that every application will see that throughput. Real delivered capacity depends on radio mode, channel bandwidth, modulation level, interference, noise floor, alignment, link margin and the network on either side. A longer route, narrow channel selection or deteriorating signal conditions can result in lower usable rates. Also consider whether traffic is symmetrical or primarily flowing in one direction and how the chosen uplink/downlink setting serves that traffic. Engineers should express requirements as measurable traffic demand, peak and average utilization, acceptable packet loss and application latency rather than relying only on a headline number. During commissioning, inspect the link’s negotiated performance and run appropriate end-to-end throughput tests using realistic traffic while allowing for normal busy-hour conditions. Use the radio specification as an input to design, not a contractual performance promise.

Range is a design question

The manufacturer’s stated maximum range is 100+ km, subject to the regulatory region and the conditions of the link. This is an upper capability claim rather than a recommended distance for every deployment. A workable path requires appropriate geometry, suitable mounting height, clear line of sight and adequate clearance around the direct path. Earth curvature and the Fresnel zone become increasingly important as separation grows. A route that appears visually open from a rooftop may still be compromised by trees, ridges, building edges or seasonal vegetation. Field surveys should establish accurate endpoint coordinates and elevations, review terrain profiles, inspect potential obstructions and estimate the radio-frequency link budget. At great distances, tower stability, alignment tolerance, local weather, interference and maintenance access become material design factors. Do not quote a distance or expected speed from a map alone. A reliable installation proposal should document why the selected path meets availability and link-margin requirements under the intended operating conditions.

Where a dedicated point-to-point bridge fits

Use the AF-5 when a fixed high-capacity path is needed between two known endpoints and a wired connection is unavailable, costly or difficult to install. Common planning scenarios include an ISP tower backhaul, an enterprise campus connection, a remote operations site or a network extension across property boundaries. The bridge can transport ordinary Ethernet traffic between network interfaces, but routing, firewalls, segmentation, switching and internet service still depend on the connected network equipment. It is not itself an Internet subscription and does not remove the need for an upstream provider. For sites with multiple remote endpoints, a dedicated series of point-to-point links or a separate point-to-multipoint design may be appropriate; one AF-5 pair should not automatically be treated as a multipoint access network. Identify exactly which sites must communicate, where upstream connectivity originates and whether redundancy is required. A simple topology drawing often exposes missing switches, backup paths, power protection or capacity assumptions before installation begins.

Line-of-sight survey essentials

A successful survey starts with more than looking across the horizon. Establish both mounting locations, record mast and roof heights and check whether each antenna has an unobstructed view toward its counterpart. Study the Fresnel zone rather than only the narrow visual line between radio faces. The Fresnel zone is a three-dimensional area around the signal path; obstacles intruding into it can weaken performance even when both endpoints can be seen. A terrain profile helps flag ridges and valleys, while site visits reveal rooftop structures, seasonal tree growth and other obstructions that mapping may miss. Survey teams should also confirm safe access for installers and enough room to mount and aim the sizeable antenna assembly. If the proposed path has marginal clearance, investigate alternative locations or increased mast height before purchasing. Document coordinates, elevations and photographs at both ends so the resulting design can be checked, installed and maintained consistently.

Spectrum and regulatory planning in Tanzania

Radio-frequency operation is subject to the rules and assignments administered by the Tanzania Communications Regulatory Authority, TCRA. The fact that a device offers a particular tuning range does not establish that every frequency or transmit-power setting can be used at a given location. Determine whether the intended service, band, channel width, outdoor power, link type and operator arrangement require a licence or other permission. Regulations and conditions may differ by frequency and deployment category, so verification must be specific to the proposed link. An installer should consult current TCRA rules, the applicable frequency plan and any license or assignment documents before configuring equipment. Avoid assuming that a licence exemption in another country applies to Tanzania. Where a professional radio planner or licensed operator is responsible for spectrum, coordinate channel choice with them at the design stage. This prevents a technically feasible but non-compliant design from progressing into expensive site work. No product description alone can certify a specific installation’s regulatory status.

Channel bandwidth and frequency selection

The manufacturer lists 10, 20, 30, 40 and 50 MHz channel-bandwidth options for this radio platform. Choosing among them is a balance of capacity objectives, channel availability, interference, link reliability and regulatory constraints. A wider channel can support more raw information under favourable conditions but also occupies more spectrum and may suffer from nearby transmissions. A narrower channel can sometimes be more resilient or easier to accommodate in a busy environment, though peak throughput may decrease. Engineers should survey the local RF environment, confirm which channels are permitted, and coordinate with neighbouring network operators when appropriate. Do not select a channel solely because a scanner currently shows little activity: interference patterns can change with time, direction and other sites’ duty cycles. Record final frequency, bandwidth and transmit-power settings as part of the installation handover. A documented channel plan makes future fault diagnosis and capacity expansion easier.

Antenna directionality and alignment

The AF-5 uses an integrated directional antenna system that concentrates RF energy toward the far endpoint. Ubiquiti specifies 23 dBi antenna gain and a 6-degree beamwidth, making careful alignment important. A small adjustment at one tower can change the signal level considerably at a distant location. Mounting brackets must be firmly secured to suitable structures, with correct azimuth and elevation settings, and installers should check that nothing shifts during final tightening. The official quick-start instructions recommend adjusting one end at a time and using signal readings to fine-tune the path. The objective is balanced, stable reception at the two endpoints rather than simply making the link indicator turn on. Document the readings before and after tightening brackets. Recheck after major maintenance, severe weather or mast work. Mechanical stability is part of network reliability: even a well-configured radio can perform poorly when its mounting structure flexes or moves.

Mounting size, wind and tower planning

The manufacturer’s mechanical specification gives overall dimensions of approximately 938.4 by 468.4 by 281.4 mm and a weight of 16 kg with the mounting assembly. These are important inputs for safe handling, bracket selection, lifting plans and tower loading. The published maximum wind survivability figure is 200 km/h; this does not replace a structural assessment or guarantee suitability for every installation site. A structural professional should assess the proposed mast, rooftop support, bracket and anchors for the actual conditions, including wind exposure, other antennas and local building requirements. Provide sufficient space for installers to secure mounting hardware, run cable and adjust the antenna without creating unsafe working positions. Equipment mass and wind loading also affect maintenance procedures and access costs over time. Avoid installing on unstable poles or unsupported improvised structures merely because the initial link can be aligned. The most economical deployment is one that is safe to access and remains mechanically reliable.

Power and PoE compatibility

The AF-5 uses passive Power over Ethernet with four-pair wiring and a specified 50 V, 1.2 A gigabit PoE adapter included in the manufacturer’s package specification. The supported input range is 42–58 V DC and maximum power consumption is 40 W. Passive PoE should not be assumed interchangeable with every IEEE-standard PoE switch port or generic injector; pinout and electrical behaviour must be confirmed for the exact equipment. Verify the contents of a supplier’s offer and the condition of any supplied adapter rather than assuming every quotation includes identical accessories. Arrange protected mains power at each site and consider a correctly designed UPS when communications must survive brief outages. Power planning should cover the radio as well as its connected switches, routers, monitoring devices and environmental equipment. Incorrect power accessories can cause damage or an unreliable link. Follow the manufacturer’s wiring and grounding instructions and use qualified technicians for electrical installation.

Network interfaces and cabling

The AF-5 provides one gigabit Ethernet data interface and a separate 10/100 MbE management interface, plus an auxiliary alignment-tone port. These ports have different jobs. The gigabit interface carries the primary bridge traffic and must be connected through suitable network hardware, while the management interface provides a management path for configuration and maintenance. Do not mistakenly plan for two equivalent gigabit data uplinks. Use outdoor-rated shielded Ethernet cabling and suitable terminations as instructed by the manufacturer’s installation guide. Ensure the selected cable length, routing and protective measures comply with equipment requirements and sound installation practice. Cable strain relief, waterproofing, entry seals and protection against mechanical damage deserve attention, particularly where the route crosses exposed rooftop areas. A cable fault can present as an intermittent radio problem, so test the complete copper path during commissioning. Label the cables at both the radio and indoor equipment to reduce errors during maintenance.

Grounding and surge protection

Outdoor radios are exposed to electrical hazards from lightning-related surges and differences in earth potential. Ubiquiti’s installation instructions require correct grounding and recommend surge protection near the radio and at the building entry point. The guide specifically discusses using protective devices at each end of a link. Appropriate earthing, bonding and cable routing should be designed by qualified personnel according to applicable electrical rules and site conditions. A surge protector is not a guarantee against a direct lightning strike, and improper grounding can introduce additional hazards. Inspect the earthing system as part of routine maintenance, particularly after building work or changes to rooftop cabling. Avoid running outdoor cabling into critical networking equipment without an installation protection plan. For organizations with strict continuity requirements, the complete power, tower and cabling design should be reviewed together, rather than treating the radio as an isolated component.

Encryption and secure operation

The manufacturer lists 128-bit AES encryption for the AF-5 platform. This is one security feature of the wireless link, not a substitute for sensible network architecture or a full security programme. Administrators should choose strong management credentials, control who can reach the device’s configuration interface, and separate management traffic from general user traffic where feasible. Keep configuration backups in a secure place and record which staff are authorized to change the radio’s settings. Monitor Ubiquiti’s applicable firmware and security guidance, test updates appropriately and plan maintenance before making changes to production backhaul. Higher-layer protections such as VPNs, access control, firewalls and segmentation may still be necessary depending on the sensitivity of the traffic being carried. When carrying traffic for multiple customers or business units, ensure that VLAN and routing policies are enforced by the overall network design. Security should be evaluated end to end, not inferred from a single encryption specification.

GPS synchronization and interference management

The AF-5 platform includes GPS-based radio-frame synchronization. This feature can matter when planning installations with multiple radios and nearby links because coordination may help manage certain forms of self-interference in compatible deployment designs. However, GPS synchronization does not remove all interference or make any frequency plan automatically suitable. RF engineering still requires antenna placement, channel planning, power selection and consideration of external emitters. Confirm how synchronization is configured for the precise topology and ensure that relevant timing and GPS reception conditions are satisfied. Inspect performance before and after deploying adjacent links instead of assuming synchronization resolves congestion. At shared tower sites, coordination with other equipment owners can prevent surprises after commissioning. Keep diagrams indicating antenna directions and channel assignments, as these are especially useful when several backhaul paths converge at one mast. A disciplined RF plan becomes more valuable as the network scales.

Capacity engineering for ISP traffic

For a service provider, the AF-5 may be one component in a broader backhaul chain. A network segment’s user experience is limited by the narrowest practical point along the path, which could be the upstream service, router processing capacity, busy-hour traffic or another radio hop. Start by calculating aggregate demand and forecast growth, including how much traffic will flow at peak periods. Consider the expected application mix, uplink and downlink proportions, service-level obligations and the number of customers sharing the backhaul. Capacity should be tested under realistic conditions while monitoring modulation, packet loss, latency and radio errors. If a single link is critical to a large customer base, plan an independent recovery path or restoration procedure. A second link on a different route or technology may provide better resilience than maximizing one radio’s peak speed. The equipment is valuable when it supports a sensible network capacity and resilience strategy, not merely when its advertised maximum exceeds the current load.

Enterprise and campus connectivity scenarios

An enterprise might consider the AF-5 to connect an administrative building to a warehouse, a second office block or another operational facility where trenching fibre is impractical. Begin with the business applications that must cross the link: data access, phones, video, backup replication, industrial monitoring or centralized authentication. These workloads have different sensitivities to latency, jitter, packet loss and outages. Confirm that switching, VLAN configuration, routing and firewall arrangements support the desired services. Plan how employees would continue working if the wireless bridge were unavailable. Some sites may need local application caching or a failover connection; others can tolerate a brief outage. Include physical security of the roof or tower, safe maintenance access and long-term ownership of the mounting location. Network extensions often fail because supporting infrastructure is overlooked, not because the radio lacks headline capacity. A sound proposal covers endpoints, cabling, power, network policies and operational support.

Designing for weather and availability

Outdoor microwave performance depends on both the environment and the engineered margin in the link budget. Wind can alter the alignment of poorly secured assemblies, water can enter incorrectly installed cable runs and vegetation can grow into a previously clear path. Extreme conditions may also prevent technicians from safely accessing a tower when a fault occurs. A practical availability plan therefore includes reliable mechanical installation, cable weatherproofing, power backup and enough path clearance and signal margin for normal variation. The manufacturer gives an operating-temperature range of minus 40 to 55 degrees Celsius, but this alone cannot tell you whether a specific rooftop enclosure or exposed mounting position is acceptable. Verify the conditions at the actual site and account for heat, ventilation, corrosion risk and seasonal weather. Define acceptable downtime before installation, and consider alternative routes if the connection serves critical operations. Performance and availability should be validated with commissioning data and periodic observations rather than assumed from specification tables.

Installation workflow from survey to handover

A disciplined AF-5 project has clear stages: identify endpoints and requirements, perform a path and spectrum assessment, complete the design, prepare mounting and electrical works, install both radios, align them, configure the link, verify service and hand over documentation. The manufacturer’s quick-start guide outlines preconfiguration, mounting, establishing the radio link and tuning the received signal. In practice, preconfiguration should include safe management access, a consistent naming convention and accurate records of intended settings. Before personnel climb, check that all materials and lifting arrangements are suitable. During alignment, measure the link from both ends and record the achieved values. Then test the wired connectivity, Ethernet transport and application traffic. Handover should include equipment model and serial records, endpoint locations, cable labels, settings backups, monitoring access and a clear escalation path. This makes future faults faster to isolate and reduces dependence on one installer’s memory.

Commissioning measurements that matter

Commissioning is not complete when the two radios simply associate. Capture received signal level at both ends, modulation and effective capacity, error and packet-loss behaviour, management reachability and stability over a useful observation period. Test application traffic over the complete path, including the routing and switching equipment that surrounds the bridge. Where possible, compare observed signal and throughput with the engineered prediction. A large mismatch may indicate misalignment, unexpected interference, incorrect settings, poor cabling or an error in the original survey. Record channel width, operating frequency, transmit power and the firmware version in service. If the test identifies an issue, investigate before declaring the path ready. A baseline report gives future support staff a reference against which to judge deterioration. Without that baseline, gradual problems can be mistaken for normal performance or attributed to unrelated equipment. Agree on pass/fail criteria with the network owner before the installation team leaves the site.

Monitoring and preventive maintenance

Once operational, the AF-5 should form part of normal network monitoring. Useful indicators include radio uptime, remote and local received signal, capacity utilisation, error or packet-loss trends, interface state, power events and management reachability. Build alerts around meaningful degradation rather than every momentary fluctuation. Keep secure backups of configuration and note changes to surrounding tower equipment, as new radios or shifted brackets can change RF conditions. Periodic visual inspections should assess mounting integrity, cable ties, weatherproofing, water ingress, grounding and signs of corrosion. Any inspection at height must follow qualified safety procedures. Review firmware guidance and schedule updates with a rollback plan where supported. For organizations with critical backhaul, define who receives alerts and what alternative service is used during an outage. Reliable operation involves people, records and maintenance processes as well as radio hardware.

Troubleshooting a low-capacity link

When throughput drops, first establish whether the problem is the wireless path or the wired network around it. Check interface negotiation, cable health and upstream congestion before changing radio settings. Then inspect received signal strength at both ends, alignment, noise or interference conditions, modulation and channel width. Compare these measurements with the commissioning baseline. A symmetric loss after tower work may indicate a moved bracket; one-sided symptoms may point toward cabling or localized interference. Avoid increasing output power indiscriminately, because legal limits, receiver overload and interference to neighbouring systems must all be considered. If a recent firmware or configuration change preceded the issue, review the change record. Document tests and restore the approved configuration after temporary troubleshooting adjustments. A repeatable diagnostic process limits unplanned outages and helps distinguish an equipment fault from a path-design limitation.

AF-5 versus AF-5U

The AF-5 and AF-5U are closely related but serve different frequency-range planning needs. The primary distinction is that the AF-5 is marketed as a mid-band bridge while the AF-5U is the high-band version. Ubiquiti’s installation guide publishes separate frequency categories for each model. Do not substitute one model for the other because the chassis appears similar or because both quote 1.2+ Gbps throughput. Review the permitted channel plan, operational role, existing network hardware and both endpoints when considering replacement. The equipment’s physical compatibility is only part of a valid migration; spectrum compatibility and live configuration also matter. For a new network, select the frequency and link design first, then confirm the appropriate model and availability. For a replacement, capture the current device model, regulatory settings and link topology so a proposed unit can be assessed properly. Ask for a verified bill of materials rather than a loosely matched model family.

AF-5 versus ordinary Wi-Fi bridges

The AF-5 is aimed at purpose-built high-capacity backhaul rather than the broad range of small Wi-Fi coverage jobs. A small wireless bridge may be suitable for a short office connection with limited traffic and simple mounting requirements, while a dedicated airFiber design may be justified where traffic demand, path length or engineered network operations are more demanding. The right choice depends on total project cost and the operational requirements, not just a maximum-throughput label. Consider the mounting structure, access arrangements, power, channel availability, equipment size, outage tolerance and skills needed to support the link. For a very short or lightly loaded path, an oversized backhaul radio may impose unnecessary infrastructure costs. Conversely, selecting basic equipment for a busy upstream route can create congestion and expensive replacement work. Compare realistic link budget and end-to-end throughput estimates before recommending a platform. A site-specific decision generally produces better value than choosing equipment solely by product tier.

Fibre, licensed microwave and hybrid alternatives

Wireless backhaul is one of several ways to connect fixed sites. Fibre can provide excellent long-term capacity where a route is accessible and installation rights are practical, but trenching and civil works may be expensive or slow. Other microwave platforms can offer different frequency, capacity, availability and regulatory characteristics. A hybrid design may use a wireless bridge as the primary connection, as a backup to fibre, or as an interim solution while construction is planned. Evaluate capital expenditure together with recurring spectrum costs where applicable, tower rent, electricity, maintenance, installation and likely future upgrades. Compare actual site-to-site service needs rather than assuming that one technology wins in every situation. For critical communications, diversity of route and failure modes is often as important as the nominal bandwidth. If an AF-5 is being considered because fibre is not available today, document how the network may evolve when a wired route becomes feasible.

Procurement checklist for Tanzania buyers

Before ordering, confirm the manufacturer and exact AF-5 mid-band model, required quantity of endpoints, whether the quotation covers a complete working link, mounting components, power adapters and any surge or cabling accessories. Obtain clear commercial confirmation of the unit condition, stock status, lead time, warranty terms and delivery arrangements from the supplier; none should be inferred from general manufacturer information. The target-listing SKU is not supplied here and must not be replaced with the model number. Ask the installer to validate country-specific channel permissions and the engineering assumptions behind the selected link. Request a bill of materials showing anything excluded, including switches, routers, UPS equipment, structural works, tower access and labour. If an existing link is being expanded, document the installed radios and the intended topology before buying components. A detailed quotation limits ambiguity and makes alternative proposals easier to compare on consistent technical and commercial terms.

Questions to ask before requesting a quote

A useful inquiry names the two locations, approximate separation distance, intended traffic capacity, peak-load estimate, building or tower mounting options and service criticality. Indicate whether the link is new or a replacement, and provide the exact model of any existing remote radio. Share relevant site photos, path-survey information and existing network diagrams through an appropriate secure channel. Note who is responsible for spectrum authorization, tower access, structural safety and electrical works. Explain whether redundant service is required and when maintenance can be performed. The supplier or installer can then help identify which details require a site survey and whether the AF-5 is a technically suitable choice. Avoid requesting a guaranteed data rate without a path assessment, because RF conditions and the authorized channel plan affect the result. The goal of the quote is a complete usable connection, not simply a box with a radio model printed on it.

Lifecycle and support considerations

Before building a long-lived network around the AF-5, check current manufacturer support resources and the availability of appropriate replacement hardware. Firmware availability, compatibility notes and product sales status can change over time. The existence of downloadable firmware or manuals does not itself guarantee a particular ongoing support period. Ask what happens if a radio fails, whether a compatible spare can be obtained and how configuration recovery will work. Where downtime is expensive, plan spare parts or an alternate route that does not rely on immediate product replenishment. Record the exact model, hardware revision when available, installed firmware and the original configuration. Any proposed migration to a different radio family should be treated as an engineered change with fresh RF and interface checks. A reliable backhaul purchasing decision should account for supportability throughout the expected service life, rather than considering acquisition cost alone.

Typical specification summary and interpretation

The AF-5 is a directional fixed wireless bridge with a stated maximum throughput of 1.2+ Gbps and maximum range of 100+ km, both dependent on deployment conditions. Ubiquiti lists a gigabit data port, a separate 10/100 management port, 128-bit AES encryption, GPS frame synchronization, five channel bandwidth options and a 23 dBi directional antenna. The specified 50 V passive PoE supply, 40 W maximum draw and 16 kg assembly weight affect supporting infrastructure design. These numbers should appear together with their limitations rather than as a promise that every installation will perform at the maximum. Confirm the operating frequency against the exact unit and applicable national rules. The engineering plan should separately state expected usable capacity, link availability target, installation materials, maintenance responsibilities and monitoring arrangements. A specification table is most useful when accompanied by the assumptions required to turn device capability into dependable network service.

Frequently asked questions

Is the AF-5 a Wi-Fi access point?

No. It is intended for a fixed, directional point-to-point backhaul link between compatible radio endpoints, not general smartphone or laptop Wi-Fi coverage.

What does 1.2+ Gbps mean?

It is the manufacturer’s stated maximum throughput capability. Actual usable traffic depends on conditions, channel configuration and the rest of the network.

Can it connect sites 100 km apart?

The manufacturer states a maximum range above 100 km subject to region and conditions. A site-specific path study and link budget are needed; the headline figure does not establish feasibility.

Can I use any 5 GHz channel in Tanzania?

No. Device tuning capability is not regulatory permission. Verify the particular operating frequencies, power levels and licensing requirements with the applicable TCRA framework.

Do I need two devices?

A point-to-point connection needs equipment at both endpoints. Have the installer confirm the exact number, models and accessories in the quoted solution.

Does it include an Internet connection?

No. It carries network traffic between sites. Internet access, upstream routing and service subscription are supplied separately.

Is AF-5 identical to AF-5U?

No. Ubiquiti identifies AF-5 as mid-band and AF-5U as high-band. Model selection must take permitted frequencies and network compatibility into account.

How is the radio powered?

Ubiquiti specifies a 50 V, 1.2 A passive gigabit PoE adapter and a 42–58 V DC supported input range. Verify accessory contents and compatibility before connection.

Can this radio be installed on a roof?

Potentially, provided the structure, anchoring, wind loading, access, grounding and line of sight are assessed by competent installers.

What happens in poor weather?

Performance and availability depend on the complete engineered link, mounting, power and environmental conditions. A proper link margin and maintenance plan help manage risks.

How do I find out the Tanzania price?

Request a current quotation for the exact AF-5 model and required link materials. Product availability, shipping and local pricing have not been verified here.

What information helps with quotation?

Provide the two endpoint locations, distance, capacity target, mounting options, existing equipment, intended service and known spectrum or installation requirements.

Request an AF-5 project quotation

Ask FourTeck Tanzania about the exact AF-5 model, current commercial availability and the materials needed for your planned point-to-point link. Include your two site locations, approximate distance, target capacity and installation requirements so the proposed solution can be assessed without unsupported assumptions.